By job to be done

The closing, then every draw.

A construction loan closes twice: once at the initial closing, then every month as each draw becomes a miniature closing. Prodeal templates both, so draws become a rhythm instead of a fire drill.

Closings 50% faster56,000+ dealsSOC 2
Flat illustration of a rising tower of document blocks with a crane and clipboard

Trusted by leading Real Estate Teams

Berkadia
Brookfield Asset Management
MetLife
Fortress
Stewart
Silverstein Properties
Paul Hastings
The problem

The initial close is heavy

Budget, plans, contracts, bonds, and completion support on top of a permanent-loan checklist.

Every draw is a mini-closing

Requisition, inspection, invoices, lien waivers, and a title date-down, monthly.

Draws arrive unstructured

Without a repeatable package, each draw scrambles and the record is incomplete.

Flat-editorial illustration: a construction draw waiting on lien waivers and inspections
How it runs in Prodeal

The closing, then every draw.

A construction loan runs from the initial close through the last draw.

01Close from a template

The heavy initial close opens from your template with the full document set in place.

02Template the draw package

Every draw is a mini-closing, and each opens from the same draw template.

03Run each draw on the list

Owners, due dates, and lien waivers per draw, so each draw runs the same way.

04Keep a record per draw

Each draw exports its own time-stamped record for the file and the inspector.

Run your next draw cycle from a template.

Book a demo
What you get

The closing, then every draw

The initial closing is heavy; then every draw is a mini-closing. Both run from templates.

Draw packages, templated

Each draw opens with its items, lien waivers, and inspection docs pre-structured.

The GC uploads directly

The contractor drops draw documents against named requests, no login, nothing forwarded.

A record per draw

Each draw exports its own time-stamped record for the file and the inspector.

Questions lenders ask

Does Prodeal handle construction draws?
Yes. Each draw runs from a repeatable package with owners and statuses, the parties upload against their lines, and every advance keeps its own record, so draws become a monthly rhythm with an audit-ready history.
Does it handle the draw cycle, not just the closing?
Yes. Each draw opens from a draw template with its own items, owners, due dates, and lien waivers, so every draw runs like the closing it is.
Can we keep a record for each draw?
Yes. Every draw has its own time-stamped activity record that exports for the file, the inspector, and the auditor.
Can borrowers submit draw documents?
Yes. The borrower and the general contractor upload against named requests in a branded room, no login required.
Keep reading
Ready when you are

Every draw, same rhythm.

Bring one construction deal to the walkthrough. See the draw package run from a template.