The closing, then every draw.
A construction loan closes twice: once at the initial closing, then every month as each draw becomes a miniature closing. Prodeal templates both, so draws become a rhythm instead of a fire drill.

Trusted by leading Real Estate Teams
The initial close is heavy
Budget, plans, contracts, bonds, and completion support on top of a permanent-loan checklist.
Every draw is a mini-closing
Requisition, inspection, invoices, lien waivers, and a title date-down, monthly.
Draws arrive unstructured
Without a repeatable package, each draw scrambles and the record is incomplete.

The closing, then every draw.
A construction loan runs from the initial close through the last draw.
01Close from a template
The heavy initial close opens from your template with the full document set in place.
02Template the draw package
Every draw is a mini-closing, and each opens from the same draw template.
03Run each draw on the list
Owners, due dates, and lien waivers per draw, so each draw runs the same way.
04Keep a record per draw
Each draw exports its own time-stamped record for the file and the inspector.
Run your next draw cycle from a template.
Book a demoThe closing, then every draw
The initial closing is heavy; then every draw is a mini-closing. Both run from templates.
Draw packages, templated
Each draw opens with its items, lien waivers, and inspection docs pre-structured.
The GC uploads directly
The contractor drops draw documents against named requests, no login, nothing forwarded.
A record per draw
Each draw exports its own time-stamped record for the file and the inspector.
Questions lenders ask
- Does Prodeal handle construction draws?
- Yes. Each draw runs from a repeatable package with owners and statuses, the parties upload against their lines, and every advance keeps its own record, so draws become a monthly rhythm with an audit-ready history.
- Does it handle the draw cycle, not just the closing?
- Yes. Each draw opens from a draw template with its own items, owners, due dates, and lien waivers, so every draw runs like the closing it is.
- Can we keep a record for each draw?
- Yes. Every draw has its own time-stamped activity record that exports for the file, the inspector, and the auditor.
- Can borrowers submit draw documents?
- Yes. The borrower and the general contractor upload against named requests in a branded room, no login required.
Every draw, same rhythm.
Bring one construction deal to the walkthrough. See the draw package run from a template.